Roof & HVAC

Roof & HVAC


Roof

The Roof is securely accessed by a permanent ship ladder located in the second floor Electrical/Data Room. The roofing installation is covered by a 20 year (10+10) warranty. Rain water is collected in cast iron drains and rain water leaders at the roof surface eliminating the maintenance demand associated with gutters and downspouts. Ultra-High efficiency heat pumps maintain classroom comfort in even the most extreme California climate zones, while beating California 2008 Title 24 energy requirements by 13% to 26% (depending upon climate zone). Full parapets screen HVAC equipment from view while creating a safe work environment for School District maintenance personnel.

“The PreFast Building has BY FAR had less work orders generated than the other two buildings we had built at the same time.”

Senior Maintenance Coordinator